  • Single 3 x 6m flat-roof: standard single car bay. ~$4,500–$6,500 supplied + installed in Cardinia Lakes / Officer / Pakenham.
  • Single 3 x 6m gable: period-match or 4WD head clearance. ~$6,500–$8,500.
  • Double 6 x 6m flat-roof: two cars side-by-side. ~$7,500–$9,500. The Cardinia Lakes / growth-corridor default.
  • Double 6 x 6m gable: two cars under a gabled roof matching house profile. ~$10,000–$12,500. The Beaconsfield / Heritage Springs default.
  • Extended bay 6 x 9m: boat, caravan or trailer storage. ~$13,000–$16,000.
  • Tandem bay 3 x 12m: two cars in line. ~$10,000–$13,000. Used where width is tight but length is available.

Numbers above are supplied-and-installed for the structure only. Add concrete slab if you don’t already have one ($65–$95/m²), permit and surveyor fees ($1,400–$2,200), and any electrical rough-ins for downlights/sensor lighting ($600–$1,500).

What’s included.

  • Site survey and Colorbond colour match at quote stage
  • Engineered drawings + AS 1170.2 wind-load certificate (Region A2, terrain 2.5)
  • Building permit lodgement with a Cardinia-area private surveyor
  • Planning permit lodgement with Cardinia Shire if required
  • Class M reactive-clay footings (900–1200mm concrete pads, deeper on Class H)
  • Hot-dip-galv or powder-coated steel posts (typically 100x100 SHS or 89mm CHS)
  • Roof structure (C-purlins or steel rafters depending on span)
  • Colorbond roof sheet (Trimdek or Spandek profile), barge and ridge capping, gutter and downpipe
  • Final frame and occupancy inspection by surveyor
  • 7-year structural warranty + Colorbond paint warranty pass-through

Wind-load engineering done properly.

Cardinia Shire is in AS 1170.2 wind Region A2, with most suburban blocks falling in terrain category 2.5. We calculate the ultimate design wind speed at ~41 m/s and engineer post size, footing depth and roof fastener spacing to that load. The engineer’s certificate is issued at quote stage and travels with the building permit application. Cardinia Shire building surveyors check it at frame stage — if there’s no engineer’s certificate, the inspection fails.

Colorbond colours we keep in stock.

The five most common roof colours across Cardinia growth-corridor estates — Monument, Basalt, Woodland Grey, Wallaby, Manor Red — we keep in stock and can usually build within standard lead time. Less common colours (Surfmist, Cottage Green, Headland, Heritage Red, Indian Red, Dune) typically add 1–2 weeks lead time but no price premium.

Lead time.

From site visit to finished carport, typical timelines:

  • Site visit + fixed quote: 7 days
  • Contract signed, deposit, permit lodged: 1 week
  • Building permit issued: 2–4 weeks (private surveyor)
  • Planning permit (if needed): add 4–10 weeks
  • Steel ordered, crew booked: 2–3 weeks
  • Build duration: 3–7 working days incl. footing cure
  • Final inspection + handover: 1 week

So a straightforward Cardinia Lakes single carport — site visit to handover — is typically about 5–6 weeks. Heritage Overlay or planning-permit jobs add 4–10 weeks at the council end.

Free steel carport quote.

Colorbond colour match at the site visit. Footing depth done right. Permits handled in-house.

Call (03) 9003 0108